Showing posts with label Howell Highway. Show all posts
Showing posts with label Howell Highway. Show all posts

Thursday, June 27, 2013

Construction on Witt Farm - Open Flare on Purse Funeral Home

 Pipeline drilling rig on Witt Farm - more of Witt Farm for sale 

Pipeline drilling rig and oil pump on Witt Farm

Preparations of the separators to accommodate for more oil wells

Looks like there are 5 separators now

Flare next to the Funeral Home

Closeup of the Flare from Howell Highway shows soot and smoke

Flare from Howell Highway shows soot and smoke

And from a little further against darker background

You may also want to read the next post that will tell you more about the nasty stuff that is in flares!





Wednesday, June 5, 2013

Drilling on Stratton's Landscaping Done - Derrick Moved Next to Purse Funeral Home

After about 2 weeks of drilling on the property of Stratton Landscaping between Heritage Park and M52, the specialized derrick for horizontal drilling was disassembled on Monday, and just moved across Beaver Creek Howell Highway to the property of Purse Funeral Home, where a "christmas tree" capped the bore hole from a previous - supposably unsuccessful conventional drill.

Drilling Derrick on Stratton's last Saturday (June 1).


Intensive grading to prepare for more drilling also on Saturday, June 1 on the Purse Funeral Home Site. Note the "christmas tree" capping the old bore hole.

Yesterday morning, the special derrick for horizontal drilling was swiftly moved just across Beaver Creek and Howell Highway to the new drill site at the Purse Funeral Home.


The derrick arrived on the Purse Site on Tuesday, June 4th 10:27 EDT.

And was setup within a couple of hours. The first two pictures are from around 11:30 am, just an hour after the last 2 pictures.


And was soon erected.

At 4:30 pm yesterday, the derrick looked almost functional..




An hour later (6/4/2013 at 5:22 pm).


And today (6/5/2013) at 10:50 am.


Thursday, May 16, 2013

Pipeline from Heritage Park to Witt Farm still on Halt

Just a brief update. The pipeline is under ground - the only piece still missing is a short clearcut from the disc golf area to Beaver Creek, passing very close to a county drain, going under the bed of Beaver Creek, climbing up the flood plain bluff, and connect to the pipes waiting on the farmland West of Howell Highway. I don't know what they waiting for? It is already 3-5 days...Maybe permits or scheduling of another 3rd party crew??